EMU Control Room Expansion

Health Methodist Hospital

This project constructed a new, expanded EMU control room that increased the monitoring capacity of the department from 2 beds to 8 beds in Methodist Hospital, as well as accommodate remote monitoring of beds in other IU Health facilities.

The project was phased to allow the new control room to be built in the footprint of the adjacent waiting room. When the new control room was operational the old one was demolished and converted to a waiting room.

leed.png

SERVICES

Mechanical Engineering
Electrical Engineering

TOTAL CONSTRUCTION COSTS

$450,000

OWNER

Robert Kaiser Senior Project Manager Indiana University Health