EMU Control Room Expansion
Health Methodist Hospital
This project constructed a new, expanded EMU control room that increased the monitoring capacity of the department from 2 beds to 8 beds in Methodist Hospital, as well as accommodate remote monitoring of beds in other IU Health facilities.
The project was phased to allow the new control room to be built in the footprint of the adjacent waiting room. When the new control room was operational the old one was demolished and converted to a waiting room.
SERVICES
Mechanical Engineering
Electrical Engineering
TOTAL CONSTRUCTION COSTS
$450,000
OWNER
Robert Kaiser Senior Project Manager Indiana University Health