About Us
Office Renovation and Secure Entrance Addition, Chemistry Lab Renovation
Benton Central Jr.-Sr. High School
Before commencing design for this engineering facility renovation project, the Architect and Engineering team performed an extensive feasibility study to develop the best project scope that could be performed with the capitol funds available.
This project is renovating and improving civil engineering laboratory and classroom spaces that support concrete fabrication, testing and research, as well as flex teaching labs and instruction areas on two floors of Hampton Hall. The project area has been completely demolished and will be fitted with all new casework and furniture.
The support the renovation, the HVAC system serving the project area was supplemented and replaced, to include new air handling unit, laboratory supply and exhaust systems, shell and tube heat exchanger, steam condensate pump and terminal units.
The plumbing scope included provisions for new process, domestic and reverse osmosis water systems, natural gas, vacuum and compressed air systems and sanitary drain system with solids interceptors.
All new LED lighting, electrical panels and branch circuitry are included in the project, as well as new fire alarm and telecommunications system infrastructure within the project space.
SERVICES
Mechanical Engineering
Electrical Engineering
Telecommunications
TOTAL CONSTRUCTION COSTS
$1,608,500
PROJECT AREA
8,850 Square Feet
CLIENT
Scholer Corporation
Let´s Talk. We´d Love To Collaborate With You.